Results
D7.1. Risk-based model and decision-making, integrating existing data
Outputs results
The risk-based model and decision-making system will integrate a set of historical and existing data from the road and railway infrastructure networks (test beds in Portugal and Ireland/North Ireland).
Expected results
Improvement of risk-based model and decision-making system.
The integration of a set of historical and existing data from the road and railway infrastructure networks (test beds in Portugal and Ireland/North Ireland) will allow the validation of this tool with such data.
D7.2. Risk-based model and decision-making, integrating innovative indicators, obtained from sensoring system
Outputs results
The risk-based model and decision-making system will integrate innovative indicators, obtained from the sensoring system developed at WP5.
Expected results
Improvement of risk-based model and decision-making system.
The integration of innovative indicators, obtained from the sensoring system developed at WP5, will allow the validation of the developed tool to new data type.
D7.3. Integrated risk-based model and decision-making framework
Outputs results
An integrated risk-based model and decision-making framework, duly calibrated and validated in two case studies, in a multimodal context, will be provided.
Expected results
Better management of transportation infrastructure risks in Atlantic Area.
An integrated risk-based model and decision-making framework, duly calibrated and validated in two case studies (in a multimodal context), will ensure that the results (optimal risk mitigation planning) will be used in a logical and consistent way.